← All articles

Getting started

From setting up your plant to the first mix suggestion and the monthly recalibration loop.

How LabMix365 works

The loop has five steps: suggest the mix, validate it in the lab, log the breaks, recalibrate the portfolio and issue the report. Each turn brings the mix closer to what the plant actually produces.

What the app delivers is a mix suggestion. It becomes an official mix design only after a lab validates it and an engineer of record signs it (a PE in the United States, an ART holder in Brazil).

Set up your plant

The country comes from the contracting address and sets the standard, units, currency and price table. In the United States the standard is ACI and the display uses psi, yd³ and lb. In Brazil the standard is ABNT and units are MPa, m³ and kg.

  • Inside the system, values are always stored in SI units; conversion happens only on screen.
  • Changing country requires a new contract.

Register materials and prices

Each plant has its own raw-material price table: cement, sand, stone, admixtures and supplementary materials. Prices keep a history, so the cost per cubic yard or metre of a mix can be rebuilt for any date.

  • Register the materials actually used and the grading of sand and stone.
  • Update a price when it changes; the earlier history is kept.

Ask for a mix suggestion

Enter the specified strength (f'c), the slump and the stone size. The engineering engine calculates cement, water and aggregates and closes the mix to one cubic metre. The calculation follows known engineering rules and is not done by artificial intelligence.

Save the result as a mix. Every adjustment creates a new version and the previous one stays available.

Validate in the lab

The lab checks the suggested mix in a study, casts specimens and logs the 3-, 7- and 28-day breaks. When the results confirm the mix, the engineer of record signs the report.

A signed report is immutable. If something has to change, a new report is issued that references the previous one.

Recalibrate every month

At month end, real breaks redraw the plant's strength against water-cement ratio curve. The system recalculates the whole portfolio and shows the difference mix by mix; you decide what to apply.

If cement consumption rises for no obvious reason, the system flags it and points to likely causes, such as cement quality, sand with organic matter or a supplier change.

Some steps depend on your plan and on the release in use. The app shows what is enabled for your account.