For ready-mix plants

Your plant's mix design, cost and technical proof

A plant owner or manager needs three answers: what it costs per month, which problem it prevents and how much time it saves. LabMix365 answers with your own operation's data.

What changes in the plant's routine

From a copied mix to your plant's mix

A full portfolio, from f'c 15 to 40 MPa (about 2,200 to 5,800 psi), calculated on the plant's materials and validated in a lab. The mix is yours, built with your sand and your stone.

Cement nobody checked

The monthly recalibration compares what the breaks delivered with what the mix predicted and shows the margin on each mix, so you decide what to adjust.

An alert before the problem

When cement consumption rises for no obvious reason, the system flags it and points to likely causes: cement quality, sand with organic matter, dirty stone, a supplier change.

Proof when a job site complains

The registered mix, the break history and the signed report, stored and ready to pull up.

Special requests

Mixes with a fixed water-cement ratio, piles or aggressive environments do not change on their own: they go to an engineer, as project-based consulting.

What the plant gets

  • A price table for each raw material, with history, per plant
  • Cost per cubic yard or metre of every mix in the portfolio
  • Rules and alerts for consumption and deviation
  • Lab studies, breaks and reports, with history
  • Mix versions: every adjustment is recorded

See whether the numbers work for your plant

Use the calculator with your own numbers, or talk to the team.